Pump Station
We were approached to execute and replace the aging infrastructure supporting an Aquifer type natural gas storage facility. Pump Station operations include brine water separation vessels, redundant emergency shut off systems, and pressurization of natural gas lifts.
We provided replacement separator vessels as well as metering, instrumentation and a complete enclosure / pump station. Because we have the internal capabilities to perform all aspects required to complete this project, the results eliminated the need for multiple suppliers. Additionally cost overruns, late deliveries and overall risk mitigations were eliminated.
Above all, Robinson created a successful environment for predictable project costs.
Project Manager ENR Top 10 engineering firm
Robinson Solution
Several modular units were constructed and completed in our controlled environment over a 3 month period. This unique situation provided gas storage engineers and facility owners a complete solution that can be replicated as other pump stations need replacement.